News
The Mine Supports the Future Development

The future development of mine support is due to the rapid construction speed and high safety demand of urban subway. The tunnel with tunneling machine is used, which does not affect the ground buildings and traffic, and fully reduces the demolition of the ground and underground, and expands the space. The technology development and application of this kind of equipment has a very broad prospect in the field of underground engineering in China.

China has a very wide market in the development of underground space. Land degradation, population explosion, shortage of resources and fragile environment have overwhelmed the surface of the earth.

In this situation, the world countries are paying increasing attention to the exploitation and utilization of underground space, and regard the underground space as a new land resource. According to incomplete statistics, in recent years, China has 180km of hydraulic tunnel, 40km of mining roadway, 270km of railway tunnel, 30km subway tunnel, and 34,000 km of micro-tunnel need excavation.

This fully proves that the 19th century is a bridge century, the 20th century is a tall building century, the 21st century is the development of underground space century.Especially along with the increasing pressure, the growing population of rail transit construction is imperative, the applicability of the floor space is more and more limited, in the future, more and more people travel since tunnel construction, therefore, as the subway become the main means of transportation, mining support will expand in the future.

If you are interested in our products, please leave a message or contact us.

Tel:+86-182 3676 6038 

Fax: +86-0371-6053 5957

Email: zxminesupport@zxsteelgroup.com


Get the Price

Address: No. 1738, 17th Floor, No. 1 Mall, Shangdu Road, Zhengdong New District, Zhengzhou City, Henan Province, China

© 2020 ZXSTEELGROUP
CONTACT US